Last week we were asked to help a team of installers move, lift and position a 15 metre, 5 ton Bridge.
A great project we carried out with our usual efficiency and quality leaving the customer extremely happy and ready for the next stage of their project.
The extremely flexible Artic HIAB and it’s extending stepframe trailer were perfect for the job.
Check out the great photos our team took onsite.
If you need a bridge or structure craned into position, lifted or transported then give our expert lifting team a call on 0800 915 2323 or complete our lifting form