How is this for a tight spot!
Our client needed a group of air handling units lifted into a location on a roof in the bustling city of Brighton & Hove in Sussex.
The job was a contract lift. This meant that after a site survey and the collation of risk assessments, method statements, and lift plans we were able to carry out this tricky lift with maximum efficiency and safety, in what was a rather confined space (well it is Brighton).
Space to set up the hiab vehicles outriggers was at a premium. We even had to extend the offside 2 legs into the customer’s own garage.
To complete the job successfully we chose our 82t/m Fassi with fly jib along with our own lift supervisor/slinger. On top of the space restrictions, we also had a pretty tight 2 hours timeslot to complete.
Another successful lift for our lifting team.